November 7 was a wet and rainy overcast day in Malden. We visited Roosevelt Park and wanted to share a snapshot of the current state of the park. Here are a few photos from an early afternoon visit.
Panorama. A wide view of Salemwood School on a rainy afternoon.Ball field. The field as it looked in the rain.Pitcher's mound on the Dell Street side. Photographed November 7, 2026.Irrigation work. Evidence of work underway on site.Plumbing. Photographed during an early afternoon visit.Warning sign. Posted at the park at the time of our visit.No dogs allowed. A posted sign at the park.Outdoor classroom area. As seen on November 7.Water in the parking area. Standing water on a rainy day.
These photos are a single-afternoon snapshot, taken in wet weather, and should be read that way. We will return to the park and update this page as we learn more.
If you have information about work at the park, or see something here we've gotten wrong, please write to us at civicbroadside@gmail.com.
A disclosure: This piece was built from photographs taken on November 7, 2026. It was prepared by the W-B-S Desk of The Civic Broadside, whose founders are identified on our About page; articles are not individually signed, to protect contributors and sources. AI assistance (Claude.ai) was used for layout assistance.
Corrections: This piece reflects our understanding of the matter as of publication and is based on public documents. We make reasonable efforts to ensure substantial accuracy. If you believe we've gotten a significant fact wrong, please email us so we can look into it.
Email:civicbroadside@gmail.com