| Bridge | Owner | Built | Vehicles a day | Lowest rating, 2025 file | 2020 to 2025 | Map |
|---|---|---|---|---|---|---|
| Clifton Street (over Comb MBTA/BMRR & Orange) | Other state agency | 1899 | 5,904 | 5 (Fair) | 5 5 6 6 5 5 | Map |
| Florence Street (over Dartmouth Street) | City of Malden | 1975 | 11,600 | 6 (Fair) | 6 6 6 6 6 6 | Map |
| Lynn Street (over Pines River) | City of Malden | 1850 | 5,360 | 6 (Fair) | 6 6 6 6 6 6 | Map |
| Route 1 (over Lynn Street) | State (MassDOT) | 1937 | 70,180 | 6 (Fair) | 6 6 6 6 6 6 | Map |
| Medford Street (over Malden River) | State (MassDOT) | 1976 | 32,100 | 5 (Fair) | 5 5 5 5 5 5 | Map |
| Mountain Avenue (over Comb MBTA/BMRR & Orange) | Other state agency | 1890 | 3,000 | 6 (Fair) | 6 6 6 6 6 6 | Map |
| Winter Street (over MBTA/BMRR) | State (MassDOT) | 1976 | 6,400 | 5 (Fair) | 5 5 5 5 5 5 | Map |
Florence Street's bridge over Dartmouth Street, built in 1975, carries about 11,600 vehicles a day. Its overall rating held at 6 (Fair) in every FHWA filing from 2020 through 2025 โ but that headline number, the lowest of the bridge's three component ratings, obscures a change worth noting: the bridge's superstructure rating slipped from a 7 (Good) to a 6 (Fair) in the 2025 file, the first change to any of its three components in the six years of data we reviewed. View on map →
Clifton Street's bridge, built in 1899 over the combined MBTA/BMRR and Orange Line tracks, carries about 5,900 vehicles a day. Its overall rating has swung between 5 (Fair) and 6 (Fair) over the six years of data we reviewed: 5 in 2020 and 2021, rising to 6 in 2022 and 2023, then back to 5 in 2024 and 2025. The swing traces to the bridge's superstructure component, which briefly rose from 5 to 7 in the 2022 and 2023 files before returning to 5. View on map →
Medford Street's bridge over the Malden River, built in 1976 and owned by the state, carries the heaviest load of the seven โ about 32,100 vehicles a day โ and has held a 5 (Fair) rating throughout the 2020-2025 period. View on map →
Mountain Avenue's bridge, built in 1890 over the same rail corridor as Clifton Street, carries about 3,000 vehicles a day and has held a steady 6 (Fair) rating since 2020. View on map →
Winter Street's bridge over the MBTA/BMRR line, built in 1976, carries about 6,400 vehicles a day and rated a 5 (Fair) across all six inspection cycles from 2020 to 2025. View on map →
National Bridge Inventory data (which MassDOT feeds) lists bridges over a minimum span, with inspection dates and condition ratings for the deck, superstructure, and substructure.
https://www.fhwa.dot.gov/bridge/nbi.cfm
https://www.fhwa.dot.gov/bridge/nbi/ascii.cfm
We are still learning more about the data recorded by the federal inventory, and welcome corrections or clarifications. Please email us at maldennewsnetwork@gmail.com
Overview & Inventory
Brief introduction to Malden's bridge infrastructure...
Clifton Street
Florence Street
Lynn Street
Lynn Street Route 1
Medford Street
Mountain Ave
Winter Street
On-Site Photo Inspections
Clifton Street Photos
Florence Street Photos
Medford Street Photos
Mountain Ave Photos
Winter Street Photos